We've been at a slow pace with the kitchen due to the crazy amount of inspections our town requires (like an insulation inspection!) and scheduling some of the subcontractors.
I know on many renovation blogs, some people have mixed emotions about hiring some of the work out. After working on a few rooms in our house, I learned that I won't touch electrical and professional drywallers are magic. When we opened the walls of the kitchen, we found knob and tube, some interesting 1980s electrical fixes, and singe marks from some old lighting fixers on some of the upper beams. Deciding not to burn our house down by doing the electrical ourselves was an easy decision. We found a local company that are known to work with knob and tube and so far we've been really happy with their work.
On Sunday, we tackled a project that we knew how to do well. Refinishing the kitchen floors!
As you can see, we've replaced the old window, the electrical is roughed-in, and insulation has been added. So, back to the floors. They weren't bad but there was an old slightly sticky layer of dark glue that was probably put down on the floor when the house was built. When we did the demo of the room, we were lucky and only had to remove a layer of luon and peel and stick tile. I'm assuming that when the room was last renovated in the 1980s, that they removed the original linoleum but left the glue remnants.
A little glue wasn't going to scare us (although in the end the glue kept sticking to the sandpaper). This was our third go at using the drum sander in our house. Remember when we refinished the floors upstairs?
Under the window, hidden beneath the cabinets, was a nice hole. Perhaps they cut it out for a vent...who knows?! Finding 2 1/2 inch width heart pine became a bit of a task. After calling around to a few salvage places in the Philly area, we were blessed with finding stock at Provenance Architecturals. Seriously the dreamiest place in the world. Not only do they have cool salvaged items but they also have a nice stock of live edge slabs that are exquisite. We gathered some floor boards from the store (and tried not to purchase anything else) and feathered them into the space where we had no floor.
So, why am I not sharing beautiful refinished floor pictures? Because they aren't done yet. On Sunday night, we added the first layer of poly onto our freshly sanded floors and then found out the next day that the drywallers wanted to come on Tuesday (they were originally scheduled to come on Thursday). We let that first layer of poly dry and today we covered the floors up with paper. But today, today we will have walls!
Showing posts with label hardwood floors. Show all posts
Showing posts with label hardwood floors. Show all posts
10.14.2014
6.24.2010
Upstairs bedroom progress
Or should I say "not-so-much" progress...
So here's my list of excuses:


We got the bed upstairs and assembled without ending our 11 year relationship.

The solid wood dresser made it upstairs too.

Of course some of the shoes found a temporary home (more on this later).

Can't wait to wrap this project up and add 300+ square feet of living space to our home.
So here's my list of excuses:
- We've been busy with other things.
- MDF is such a pain to pick up at the store since you need to find willing parent and time to borrow their truck.
- It's really really hot outside which makes the upstairs really hot.
- We need a couple hour block of day light to work on the molding.
- I need to pick more wall paint for touch-ups. I thought I would be good with left over paint, but I'm really bad a sealing cans. We do have a small sample in a semi-gloss but our walls are painted with a matte.
- We are also painting the basement floor.
- We like to watch tv.
We got the bed upstairs and assembled without ending our 11 year relationship.
The solid wood dresser made it upstairs too.
Of course some of the shoes found a temporary home (more on this later).
Can't wait to wrap this project up and add 300+ square feet of living space to our home.
6.03.2010
Refinishing the floors: Part 3
Here's some fun (yeah, right) tips for refinishing hardwood floors that we learned along the way:
- get a good mask: We wore crappy masks and interesting things were coming out of our nose (what, too much info?).
- get ear plugs: Yeah, we didn't wear ear protection and our ears were ringing for quite some time. That edge sander is really loud when using in a room without furniture.
- clean as you go: I'm a "clean as you go" person. Since our upstairs has a dutch door at the bottom of the stairs, we did not have any wood dust downstairs. I did keep a broom and bucket upstairs to sweep up as we were working. The only things I've had to clean up so far are the upstairs windows and moldings. Not too bad. We also emptied the drum sander bag frequently and used the shop vac to clean the sander about every hour.
- tape up everything: We taped up the built-in cabinets but forgot to tape up our fake return duct. The upstairs return duct is actually our attic/bathroom fan. Last night, the Dude shop vac'd (is that a verb?) it out because we were afraid we would set the house on fire by a wood dust spark.
- timing: You might consider sanding your floors before you move into your house with all of your
junkthings and not picking a weekend with the temperature in the 90s (which meant the upstairs was in the triple digits). We failed on both parts. - prep work: Prepping the room or for any project is the suckiest part of the job. You really need to take some time getting everything prepared for sanding and putting down poly. If you take a short cut, it will show or you have a chance to set your house on fire by not removing all of those stupid staples in the floor from the carpet. We also thought we could get away with not sanding between coats of poly. In between the first two coats we did not sand but then started after that since the floors did not feel that smooth.
- low expectations: We had very low expectations going into the project. Originally we thought the boards would be in horrible condition and I was already mentally preparing to paint the floor. Also, it's an old house...we knew the floors would not look like the fancy new mcmansion.
- vacation: Okay, this part is lame. But we treated this project like we were on some wacky three day vacation. We forgot to go food shopping prior to starting and was "forced" to eat out for most meals. We also treated our self to ice cream every night as a reward. Also, the Dude had to use my bathroom since his was the one upstairs housing a tv, a tv stand and shoe storage units. He mentioned that using my bathroom was like he was staying at a hotel. I know, what ever works...
Hope our mis-steps help you on your hardwood floor project.
Since this post is a bit long, I'll put something together with the budget and timeline a little later.
6.02.2010
Refinishing the floors: Part 2
After all of the prep and sanding, we were finally ready to poly the floors on Sunday night. We chose a water-based polyurethane in a semi-gloss from Behr. I wanted to use a water-based poly because it dried quickly and did not really have much of an odor.
Unfortunately....the tool rental guy that we purchased the poly from was not aware that 1. it was the last gallon at their Home Depot and 2. the reason it was their last gallon...because the product was being discontinued. We did not realize issue one or two until we needed another gallon the next day.
The poly was put down with a lambswool pad. We thought we could get away with not sanding and re-cleaning the floors between coats, but after the second coat we realized we really should sand. While the Dude was out looking for more poly, I went to our local Ace Hardware to get the sand paper, sandpaper pad attachment, a scraper for the corners (the edge sander could not get in the corners) and a microfiber cloth.
The Dude secured two more gallons (one extra for "just in case") and we put down two more coats with sanding in between.
Now we have to wait 72 hours after the last coat for the floors to cure. Ugh, I can't wait to get the room and house back in order!!
Sorry for the crappy iPhone pictures...





>
The next post will be lessons learned and other fun tips! Wheee!
Unfortunately....the tool rental guy that we purchased the poly from was not aware that 1. it was the last gallon at their Home Depot and 2. the reason it was their last gallon...because the product was being discontinued. We did not realize issue one or two until we needed another gallon the next day.
The poly was put down with a lambswool pad. We thought we could get away with not sanding and re-cleaning the floors between coats, but after the second coat we realized we really should sand. While the Dude was out looking for more poly, I went to our local Ace Hardware to get the sand paper, sandpaper pad attachment, a scraper for the corners (the edge sander could not get in the corners) and a microfiber cloth.
The Dude secured two more gallons (one extra for "just in case") and we put down two more coats with sanding in between.
Now we have to wait 72 hours after the last coat for the floors to cure. Ugh, I can't wait to get the room and house back in order!!
Sorry for the crappy iPhone pictures...
The next post will be lessons learned and other fun tips! Wheee!
6.01.2010
Refinishing the floors: Part 1
Over the long weekend, we decided to finally tackle the floors upstairs. Our upstairs is a 330 square feet finished attic space (plus a full bathroom) in a cape cod-style bungalow. We started pulling up some of the carpet in January (wow, time flies!).
When I got home from work on Friday, I started taking everything downstairs and created a crazy "Hoarders" look on the main floor. That night we continued to pull up more carpet, staples, tack strips and molding. We gave up that night with the bed area because we were dreading taking apart the bed and removing the mattress.

Saturday morning we pulled up the last of the carpet and took apart the bed and removed the rest of the items. We attempted to shove the mattress down the steps but it was not working out how we planned. I have no idea how we got the mattress upstairs in the first place. In the end we covered the mattress up and left it upstairs on the staircase half wall.

Around 3:30pm we arrived at Home Depot rental and picked up a drum sander with all of the expensive sand paper (in the end, we were able to return 8 unused sand paper rolls). By 4pm - we were sanding.
Since we started off the project with very low expectations, we were happy with just the first pass of the sander. As you can see, our 80-90 year old floors were never finished but had tons of drywall mud and paint from a previous remodel in the early 1990s.


The floor boards did not have too many surprises. We filled a large section of one board (above) with wood filler. We knew it would not look like the other boards, but since we already had lowered expectations, we just described it as "character."



We sanded until 9pm on Saturday and started back up around 10am on Sunday morning. By 1:30pm we were back at Home Depot to return the drum sander and to rent the edger sander. We thought we could get away with not using the edge sander and just use our hand sander and cover the edges up with molding. But...fail. The edge sander was really necessary and we were able to finish the edges within 45 minutes.

Tomorrow's post will be our poly adventure!!
When I got home from work on Friday, I started taking everything downstairs and created a crazy "Hoarders" look on the main floor. That night we continued to pull up more carpet, staples, tack strips and molding. We gave up that night with the bed area because we were dreading taking apart the bed and removing the mattress.
Saturday morning we pulled up the last of the carpet and took apart the bed and removed the rest of the items. We attempted to shove the mattress down the steps but it was not working out how we planned. I have no idea how we got the mattress upstairs in the first place. In the end we covered the mattress up and left it upstairs on the staircase half wall.
Around 3:30pm we arrived at Home Depot rental and picked up a drum sander with all of the expensive sand paper (in the end, we were able to return 8 unused sand paper rolls). By 4pm - we were sanding.
Since we started off the project with very low expectations, we were happy with just the first pass of the sander. As you can see, our 80-90 year old floors were never finished but had tons of drywall mud and paint from a previous remodel in the early 1990s.
The floor boards did not have too many surprises. We filled a large section of one board (above) with wood filler. We knew it would not look like the other boards, but since we already had lowered expectations, we just described it as "character."
We sanded until 9pm on Saturday and started back up around 10am on Sunday morning. By 1:30pm we were back at Home Depot to return the drum sander and to rent the edger sander. We thought we could get away with not using the edge sander and just use our hand sander and cover the edges up with molding. But...fail. The edge sander was really necessary and we were able to finish the edges within 45 minutes.
Tomorrow's post will be our poly adventure!!
1.19.2010
What they never show you on those home improvement shows...
Staples! The amount of staples that await you when you rip up carpet = total fun.
Carpet in the process of being removed (upstairs):
Carpet is up!
We decided to start with removing just 1/3 of the carpet and baseboards in the upstairs attic/bedroom. Since we have a lot of stuff on the other side of the room, my next step is to clear out the downstairs office to make room for storage.
Originally we were going to paint the floors but now we are thinking about sanding and staining. Our goal is to get everything done by the summer so we can move our master bedroom upstairs.
Any advice for refinishing the floors?
11.16.2009
Can it be saved?
The dude started to pull up the carpet upstairs. So far the hardwood floor doesn't look horrible but it doesn't look good either. Originally I was thinking that we would paint the floors a soft white, but maybe we should stain them. Thoughts?
Subscribe to: